36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses
Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only.
Burner 3 boiler/burner controls where applicable and local display.
Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only?
Oxygen analyzer must send signals/information to combustion controls to control trim.
What is the material of construction for the stack? Is it single or double wall?
Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S.
Current operating pressure and temperature of the system for boiler #3?
Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit.
What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)?
4-20 mA analog.
Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)?
Steam flow meter is wired into local CB Hawk analog terminal block.
Please provide nameplates for the existing oxygen analyzer and steam flow meter.
Oxygen analyzer nameplate:
Steam flow meter nameplate:
Point of Contact
- Sheryl Harris — sheryl.harris5@va.gov — email only
View on SAM.gov
https://sam.gov/workspace/contract/opp/fd26eac21a2a43e9afa95a8149c0c136/view
Details
- NAICS
- 238220
- Set-Aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2026-10-22
- Deadline
- Oct 26, 2026
- Solicitation #
- 36C24727Q0050
Want these matched automatically?
Add your NAICS codes and get opportunities like this emailed to you daily.
Start Free Trial