Back to Search

Building 510 Substation Upgrade - Phase I

ENERGY, DEPARTMENT OF

Description

<p>Notice of Interest: BSA is seeking interested contractors capable of performing the work describled below and interested in receiving the forthcoming solicitation. The formal solicitation will be issued at a later date and will also be posted on SAM.gov at that time. Note that switchgear and transformers are being provided to the contractor as Government Furnished Equipment (GFE). Interested contractors are invited to submit a statement of interest along with a capabilities statement to BSA&#39;s Contract Specialist, Megan Howard, at mhoward@bnl.gov. Please include your Sam.gov Unique Entity Identifier (UEI).</p>

<p><br />
Project Description:</p>

<p>The Physics Building was constructed in 1962 and much of the electrical system, original to the&nbsp;building, is beyond its useful life. These systems are also not compliant with current building&nbsp;codes, contain hazardous materials and need complete upgrades. The existing protective devices&nbsp;may not operate as specified, increasing the potential for arc-flash hazards and system damaging&nbsp;electrical faults. Repairs are cost prohibitive and may lead to extended unplanned outages in this&nbsp;mission critical facility.</p>

<p>The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for&nbsp;complete removal and upgrading of the existing&nbsp;Building 510 electrical substation equipment that feeds the newly replaced electrical distribution&nbsp;switchgear. This project includes the removal of two medium voltage substation transformers, one medium&nbsp;voltage oil switch and medium voltage distribution cabling. The project also includes the&nbsp;installation of a new exterior substation with two new medium voltage transformers, one pad&nbsp;mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct&nbsp;bank. The new substation will be constructed in the north-loading dock parking lot, complete with&nbsp;new transformer and switchgear pads, grounding and crushed stone. Long lead electrical equipment&nbsp;procurements are planned early in the project and construction of the substation infrastructure can&nbsp;be completed in parallel. Once the cutovers are completed the old transformers and oil switch will&nbsp;be removed from the equipment vault in the basement of Building 510. The Contractor shall not procure the switchgear or transformers under this contract.&nbsp;Installation will be executed&nbsp;in a phased approach in order to minimize electric service disruptions to the building and will&nbsp;provide provisions for future redundant circuit configuration.</p>

Point of Contact
  • Megan Howard — mhoward@bnl.gov — 6313442712
  • Chad Wilson — cwilson@bnl.gov — 6313444886
View on SAM.gov

https://sam.gov/workspace/contract/opp/c59f6b8179ec49cc937da49033f9dd0b/view

Register free to unlock full details

Full description, point of contact, and the direct SAM.gov link are visible with a free account.

Start Free 10-Day Trial
Details
NAICS
238210
Set-Aside
Small Business Set Aside - Total
Posted
2026-10-12
Deadline
Oct 23, 2026
Solicitation #
MH484019
Want these matched automatically?

Add your NAICS codes and get opportunities like this emailed to you daily.

Start Free Trial