Back to Search

Battery Energy Storage System (BESS) Relocation

DEPT OF DEFENSE

Description

<p>21 July 2026 - Edited to add Wage Determination.</p>

<p>There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.&nbsp;</p>

<p>Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover&nbsp;Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I&#39;ve also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.&nbsp;&nbsp;<br />
&nbsp;</p>

Point of Contact
  • Kevin Fenner — kevin.fenner.1@us.af.mil — 8455632832
  • Joseph Kugler — joseph.kugler.1@us.af.mil — 8455632831
View on SAM.gov

https://sam.gov/workspace/contract/opp/958f9ba55e1545e994c6a0316aeb75fa/view

Register free to unlock full details

Full description, point of contact, and the direct SAM.gov link are visible with a free account.

Start Free 10-Day Trial
Details
NAICS
488510
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2026-07-21
Deadline
Aug 6, 2026
Solicitation #
W50S8D26QA015
Want these matched automatically?

Add your NAICS codes and get opportunities like this emailed to you daily.

Start Free Trial