Description
The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package.
Point of Contact
- David Brown — david.brown.39@us.af.mil — 5862395867
- John Donnell — john.donnell.1@us.af.mil — 5862394881
View on SAM.gov
https://sam.gov/workspace/contract/opp/707709d604d446e38bbdd8f0d74b1083/view
Details
- NAICS
- 238390
- Set-Aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2026-07-27
- Deadline
- Jul 30, 2026
- Solicitation #
- W50S8526BA004
Want these matched automatically?
Add your NAICS codes and get opportunities like this emailed to you daily.
Start Free Trial