Description
<p>The facility located at the USDA Subtropical Horticulture Research Agricultural Research Service (ARS) Station has approximately 6,000 square feet of lab and office area. The ductwork is collecting condensation and causing water damage. The HVAC system consists of one air-cooled chiller, associated pumps, and two variable air volume air handling units. The humidity in the labs was tested and determined to be higher than the acceptable range (70% or higher). A&E firm Clark Nexsen provided retro commissioning with TAB services and proposed solutions for the condensation problem, as well as designs for the renovation of the roof, HVAC, BAS, and chiller.</p>
<p>Solicitation documents are posted below.</p>
Point of Contact
- Jim Roloff — james.g.roloff@usda.gov
View on SAM.gov
https://sam.gov/workspace/contract/opp/6386a30df7a34ae8acd5fa550e52b2dc/view
Details
- NAICS
- 238220
- Set-Aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2026-07-20
- Deadline
- Aug 19, 2026
- Solicitation #
- 12639526Q0232
Want these matched automatically?
Add your NAICS codes and get opportunities like this emailed to you daily.
Start Free Trial