PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222
DEPT OF DEFENSE
Description
<p>USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.</p>
<p>The definitive removal / demolition work items for each building will require: <br />
a) Hazardous material / debris abatement and removal mostly within the crawl space <br />
b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc. <br />
c) Removal at ~ 90% removal of building mechanical – electrical systems <br />
d) Removal of the existing roof EPDM system (but not the roof framing structure) <br />
The definitive repair / new work items for each building will require: <br />
e) New exterior envelope <br />
f) New building mechanical – electrical systems <br />
g) New Thermoplastic Polyolefin (TPO) Roof system <br />
h) Painting of exteriors<br />
Other considerations for site work coordination:<br />
i) New utility connections (mostly by other entities)<br />
j) Shared construction boundaries with adjacent current and future projects</p>
Point of Contact
- Cassandra Gonzalez โ cassandra.p.gonzalez@usace.army.mil โ 2065073218
- Shawna West โ shawna.west@usace.army.mil
View on SAM.gov
https://sam.gov/workspace/contract/opp/4ca158ffc3d24a9b83429ee9612c50a9/view
Details
- NAICS
- 236220
- Set-Aside
- Small Business Set Aside - Total
- Posted
- 2026-09-25
- Deadline
- Oct 8, 2026
- Solicitation #
- W912DW27RA017
Want these matched automatically?
Add your NAICS codes and get opportunities like this emailed to you daily.
Start Free Trial