USCG Station Eaton's Neck Boiler Combustion Analysis and calibration
HOMELAND SECURITY, DEPARTMENT OF
Description
<p>THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487.</p>
<p>This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768)</p>
<p>Each housing unit contains the following equipment covered under this agreement:</p>
<ul>
<li>Boiler: Weil-McLain EVG 299 (280,000 BTU)</li>
<li>Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2</li>
</ul>
<p>The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.</p>
Point of Contact
- Steven Bell — Steven.A.Bell@uscg.mil — 206-827-1461
View on SAM.gov
https://sam.gov/workspace/contract/opp/156ed7b92043463187dd5006a73bf74b/view
Details
- NAICS
- 238220
- Set-Aside
- Small Business Set Aside - Total
- Posted
- 2026-11-02
- Deadline
- Nov 13, 2026
- Solicitation #
- 70Z02427QBOST001
Want these matched automatically?
Add your NAICS codes and get opportunities like this emailed to you daily.
Start Free Trial